Use this form to start a Chicago door access project. List the openings you want on badges, the number of people who will use them, and the date the space has to be ready, and ClearMax Labs answers with questions or a written scope based on what you send. Email works too: hello@chicagodooraccess.com.
Last updated: November 2026
Your door list, in one form
Calls to this number may be recorded or answered by an automated assistant. Please do not share door codes, badge numbers or alarm codes by phone.
Details that shape the first scope
A short note is enough to start. These are the details that let the reply skip a round of questions:
- The building and the floor. A Loop high-rise, a mid-rise in River North and a one-story building on the Northwest Side each bring different routes to the closet and different people to ask first.
- Every opening you want controlled, with its job: the entry from the elevator lobby, a rear or alley door, the network closet, a stockroom, a stair door, a parking or dock gate.
- What each door has now: plain keys, a keypad, a landlord badge reader, an aging card system, a buzzer.
- Photos of each door and frame, taken from both sides. Storefront aluminum, hollow metal and wood each take different hardware, and a photo often settles it.
- Head count, and whether anyone splits time across more than one site.
- The building's contact, if you lease. Most Chicago landlords want to see a hardware schedule before anything is mounted on a corridor or stair door.
- The date the space must be ready, and whether it is under construction or already in use.
- Add-ons you are considering, such as an entry intercom or door cameras, so they ride on the same cable plan.
Why does the ready date drive the plan?
Because some of the steps that come before a working door take time that nobody on site controls. The Chicago Department of Buildings says a separate permit is required for any work involving or affecting a fire alarm system or a device integrated with a fire alarm system, such as an electronic door locking system. A door that releases on the fire alarm therefore carries that permit, and the schedule leaves room for it.
Some doors need a sign-off before the hardware is even chosen. Chicago allows key-operated locking on the egress side of a main door in Group A spaces of 300 or fewer occupants and in Groups B, F, M and S only where approved by the fire code official, with a posted sign reading THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED. If you want a deadbolt on the front door after hours, say so in the note, because that request changes the order of the work.
Moving offices or opening a second site?
Say so in the note, and include both addresses if you have them. A move changes the order of the work: the doors at the new space are planned and cabled while the old space keeps running, and the switch to the new system is set for a single evening or weekend so nobody arrives on Monday without a working badge. If the old system is staying behind for the next tenant, the scope says which parts leave with you and which stay.
A second location works the same way. Tell us how many people work at both, because one list of people across two buildings is planned differently from two separate systems. The reply asks what the landlord at each address allows, and whether the new site has a network closet yet. If it does not, the scope says where the controller and switch will live before any door hardware is chosen.
What should never go into the note?
Anything that opens a door. Leave out keypad codes, badge numbers, alarm codes and the login to any system already on site, even if it seems useful for planning. The door list and the photos are enough to plan the job. New credentials are issued in person at handover, so nothing that grants entry has to travel by email.
Locked out or a door failing today?
This form is for planning projects, and it is read during business hours. For a lock that will not release right now, call the company that installed it or the building's engineer. Buildings already under a ClearMax service plan use the contact in their handover records.
After the door list arrives
First comes a reply with any questions the list leaves open. Then a written scope that names each opening, its reader and lock, how it releases from the inside, the permits it needs and the dates. If the building turns up something that changes the work, such as a frame full of grout or a riser with no room, it is raised with you and the scope is revised before anything proceeds. The scope also lists what the business provides on work days: ceiling access, a spot in the network closet, building access for the crew and a person to call.
When the scope is agreed, the work is booked around the ready date, the landlord's rules for after-hours noise and freight-elevator use, and any permit dates. At handover, each door is tested with you, the administrator login is passed to the person you name, and the as-built drawings and door list are left with you.
